Work Hours: 9:30 am - 5:30 pm
Again... we were pretty unproductive the first half of today. We still
were trying to figure out how to get the Data Acquisition cards to work.
Which was actually a very important task, since we basically were at a
standstill until we could figure that out. And the guy that had
promised us that he was going to come in to help us out this morning didn't
show up until 12:30 when we were about to go on lunch break. So we
figured it out finally... it was a silly little compatibility error between
the copy of Matlab we had (which was network version) and the version of the
Data Acquisition Toolbox (which was an individual version).
So we took our lunch break kinda late... and for some reason my watch was
off by an hour and we ended up taking a 2 hour lunch break.. lol...
After that we did some stuff with the Data Acquisition stuff and made sure
it was working.. then it was time for the weekly lab meeting. This
week some guy discussed Floating Gate Transistors.
So then we were out of there...
I called Miss Harbin right when I got back to my room to tell her that I
wasn't going to be able to make it to her wedding. It was funny though
because I checked the mail and there was the wedding invite there in my
mailbox today (btw... it had gotten lost in the mail after my dad sent it to
me). But Miss H and I had about a 10 minute conversation on the phone,
catching up and all. She suggested a concert that's happening in July
that I should look into.
But now I'm home for the evening and back to the normal winding down from
work routine now.
|