Karli bridge
constructed on Redi-Revas Coastline Highway (SH-04). The bridge come up with some momentous
magnitude. It bonds two Taluka by means of Road Connection. Total width of the
bridge = 264 meters. And height of the bridge =7.50 meters.
Type of Bridge
Foundation - RCC Well, pillar
Bridge - RCC support, slab
Height - 7.50 meters
Width - 264
meters
Duration of Work
29-12-1997 to 30-6-2002
Total money spend
1152.00 lacks
|