Project Nádudvar
Soil and ground water clean-up
Back
Soil and groundwater contaminated by motor oil and diesel
oil were delineated around two filling stations. Based on the authorised
environmental action plan MEGATERRA excavated the soil contaminated above
the limit (1.000 mg/kg TPH), formed biopads and stimulated the indigenous
oil eating microbes. After two years target hydrocarbon level was reached.
Ground water clean-up was carried out with 3 production wells,
active carbon filtering technique and injection trench. Starting oil concentration
was: 3-5 mg/dm3. After 2 year long treatment period with 40 m3/day extraction
rate target hydrocarbon level (0,6 mg/dm3) was reached.